Robinia Rope Net Climbing Frame – Rope Web, Angled Net, Rope Ladder & Pull-Up Bar
Robinia frame with rope web, angled net, rope ladder and pull-up bar. 11 users, ages 4+, FFH 2.0 m. Certified to BS EN 1176-1:2017+A1:2023.
Overview
A compact climbing frame for trim trails, schools and parks. A Robinia post-and-log frame holds four climbing activities: a rope web inside the frame, a rope net angled down to the ground, a vertical rope ladder and a stainless steel pull-up bar. Up to 11 children can use it at once from age 4, building grip and upper-body strength, coordination and confidence at height. The frame measures 2.81 x 2.32 m, stands 2.0 m tall and needs a 33.2 m² safety zone (6.65 x 6.17 m) with impact-absorbing surfacing throughout. Certified to BS EN 1176-1:2017+A1:2023, it installs in about three and a half hours.
- Product type: Robinia rope net climbing frame
- Functions: Rope web, angled climbing net, rope ladder, pull-up bar
- Dimensions (L x W x H): 2.81 x 2.32 x 2.00 m
- Safety zone: 6.65 x 6.17 m (33.2 m²)
- Free-fall height: 2.0 m
- User capacity: 11
- Users: Recommended age 4+
- Frame: Robinia posts and logs, about Ø18 cm, anchored 80 cm deep
- Ropes & nets: Steel ropes in polypropylene braid with aluminium, stainless steel and plastic connectors
- Chains: Calibrated stainless steel
- Bar: Stainless steel
- Standard: BS EN 1176-1:2017+A1:2023
- Surfacing: EN 1177 surfacing across the whole safety zone, e.g. 300 mm loose fill
- Morti ref.: MSP1310VJJ
Specification
Certified to the relevant BS EN standard — full details in the product description and data sheet
Safety & surfacing
We'll match the safety surfacing to this item's free-fall height, your site and your budget, and include it in your quote. Where impact-absorbing surfacing is needed, it meets EN 1177. Annual inspection is recommended for school and public installations.
Downloads
Need CAD files or a site-specific layout? Ask us and we'll send them over.
Get a free design & budget price
Tell us your site size and age group and we'll send a layout, surfacing options and a budget price — usually within one working day.
















