Steel trim trail wobble step balance challenge with a series of moving stepping platforms

Trim Trail Wobble Step Challenge

Steel trim trail wobble step challenge: a run of moving steps that builds balance, core strength and coordination. For schools, parks and activity trails.

Footprint
1.68
Fall height
1
Users
3
Ages
4-14
  • Designed, supplied and installed by our own teams
  • Certified to the relevant BS EN standard — handover pack included
  • Safety surfacing quoted alongside
  • Free design & budget price, usually within one working day
Prefer to talk? Call 01278 741 110

Overview

The Trim Trail Wobble Step Challenge is a steel balance obstacle for playgrounds, parks and outdoor activity trails. Children cross a series of moving steps that wobble underfoot, developing balance, core strength, coordination and confidence as they go. Its steel construction is built for year-round outdoor use, and it can be installed as a standalone challenge or as part of a wider trim trail. Well suited to primary schools, secondary schools and public parks.

  • Equipment Type: Trim trail balance challenge
  • Construction: Steel
  • Activity: Crossing a series of moving wobble steps
  • Play Benefits: Balance, core strength, coordination and confidence
  • Installation: Standalone or as part of a wider trim trail
  • Suitable for: Primary schools, secondary schools and public parks

Specification

Total footprint (m²)
1.68
Critical fall height (m)
1
User capacity
3
Age range
4-14
Length (cm)
336
Width (cm)
50
Height (cm)
223
Standards

Certified to the relevant BS EN standard — full details in the product description and data sheet

Morti ref.
P-NETTIX1610

Safety & surfacing

We'll match the safety surfacing to this item's free-fall height, your site and your budget, and include it in your quote. Where impact-absorbing surfacing is needed, it meets EN 1177. Annual inspection is recommended for school and public installations.

Get a free design & budget price

Tell us your site size and age group and we'll send a layout, surfacing options and a budget price — usually within one working day.